top of page
Above the Clouds

Project Experience

Power Plants

Completion of CEQA equivalent air quality and greenhouse emissions analyses for over two dozen natural gas fired and over a dozen renewable thermal energy power plant siting cases for the California Energy Commission (CEC), and over a half dozen wind power plants, and several photovoltaic solar power plants for other clients.

 

Completion of visible and/or thermal plume modeling analyses for several dozen CEC power plant siting cases. Development of the technical methodology for visible and thermal plume analyses and completion of the CEC's Plume Modeling Training Course manual.

 

Expert witness testimony given to support staff impact analyses for several CEC power plant licensing cases. 

Completion of the Air Quality and GHG emissions sections for the SONGS Unit 2 & 3 Decommissioning Project EIR.

Large Infrastructure/Earthmoving Projects

Completion of air quality and greenhouse gas analyses for several large flood control projects and other large earthmoving projects for Federal, State, and County agencies.

  • Castaic Spoils Pile Removal Project

  • Ventura River Levee VR-1 Improvements Project IS

  • Santa Clara River Levee Project SCR-1 Admin Draft IS

  • Santa Clara River Levee Project SCR-3 EIR

  • Sespe Creek Levee Improvements Project EA/MND

  • Thousand Palms Flood Control Project EIR/EIS

  • Littlerock Reservoir Sediment Removal Project Draft EIS/R

  • Santa Ana River Interceptor Line (SARI) Protection/Relocation Project EIS/R

  • Matilija Dam Ecosystem Restoration Project EIS/R

General Conformity Analyses completed as necessary for these projects.

Third Party Document Review

Third party review of administrative draft documents or commenting on completed CEQA/NEPA documents, including:

  • Deep Draft Navigation Feasibility Study ADEIS/ADEIR

  • Toyota Logistic Services Improvement Project Admin Draft IS/MND

  • Pier B On-Dock Rail Support Facility Project ADEIR

  • PCMC Chassis Support Facility Project Admin Draft IS/MND

  • Mitsubishi Cement Facility Expansion Project ADEIR

  • Baker Cold Storage Facility Admin Draft IS/MND

  • Digital 395 Project ADEIR

  • Donlon Road Re-alignment Project ADEIR

  • Newhall Ranch Project ADEIR

  • Cabrillo Port Liquefied Natural Gas Deepwater Port Draft EIS/EIR

  • Long Beach LNG Import Project Draft EIS/EIR

Third party reviews included the detailed review of emissions calculations and air dispersion modeling and health risk assessment modeling analyses where necessary.

Port and other Marine Projects

Emissions inventories and CEQA/NEPA impact analyses for several Port of Long Beach, Port of Los Angeles, Port of San Diego and City of Hermosa Beach projects.

  • World Oil Tank Installation Project IS/ND

  • SCE’s Transmission Tower Replacement Project EIR.

  • Eagle Rock Marine Terminal Project EIR/EIS.

  • TTI Grain Export Terminal Project EIR.

  • Sulex Demolition Project MND.

  • Innovative Barracuda Chassis Depot IS/ND.

  • Innovative New Dock Chassis Depot IS/ND.

  • Mitsubishi Cement Corporation at Warehouse C Project ADEIR

  • E Street Marsh Living Shoreline Project IS/MND

  • Transpacific Submarine Fiber Optic Cable Systems Project EIR

  • RTI Infrastructure Transpacific Fiber-Optic Submarine Cable Systems Project EIR

Screening level air quality analyses for several prospective Port of Long Beach projects. 

Energy Infrastructure

Completion of air quality and greenhouse gas emissions/Climate Change CEQA or CEQA/NEPA impact analyses for over two dozen energy infrastructure projects. including several multijurisdictional electric transmission line and other energy infrastructure projects, including:

  • Beacon Energy Storage Project

  • Suncrest Dynamic Reactive Power Support Project IS/MND

  • Valley South Subtransmission Project EIS/R

  • Vine Substation Project IS/MND

  • Downs Substation Project IS/MND.

  • Tehachapi Renewable Transmission Project EIS/R.

  • SCE El Casco System Project EIR

  • SCE Antelope-Pardee 500-kV Transmission Project EIR/S

  • SCE Antelope Transmission Project, Segments 2 and 3, EIR

  • SCE Devers-Palo Verde 500-kV No. 2 Transmission Line Project EIS/EIR

 

General Conformity Analyses completed as necessary for these projects.

Institutional, Recreation, and Residential

Completion of air quality and GHG emissions analyses for several dozen institutional, recreation, or residential projects, including:

  • Walnut Park Pocket Park Project EIR Addendum

  • Los Angeles River Segment B Load Reduction Strategy Project EIR Addendum

  • Whittier Aquatics Facility Project IS/MND

  • Gates Canyon Park Regional Stormwater Project EIR Addendum

  • Ladera Park Regional Stormwater Project EIR Addendum

  • Peter J. Pitchess Detention Center Landfill Closure Project IS/MND

  • Altadena Sheriff’s Department Parking Lot Expansion Categorical Exemption.

  • Central Regional Middle School #7 IS/MND

  • Southern Regional Middle School #6 EIR

  • Narbonne High School Stadium Lighting and Improvements IS/MND

  • Maclay Elementary School Addition IS/MND

  • San Mateo Place senior low income residential housing project air quality technical report

  • San Mateo Senior senior low income residential housing project air quality technical report   

bottom of page